Hydraulic Climbing Mold
Hydraulic Climbing Mold
Hydraulic Climbing Mold
Hydraulic Climbing Mold
Hydraulic Climbing Mold
Hydraulic Climbing Mold

Applications:Bridge engineering (cable-stayed towers, high piers), high-rise building engineering

Product Features:
formwork versatility, design can meet the bearing platform, pier body, forming traveller formwork construction needs, improve the utilization rate of the formwork

Email Consultation
WhatsApp
0086 18874158493

Wuxin features

01 Design capacity

If the inclination angle is less than 15 °, the climbing frame system can be rented, and the segment height is divided into 4.5m and 6m.

formwork versatility, design can meet the bearing platform, pier, forming traveller formwork construction needs, improve the utilization rate of the formwork.


Hydraulic Climbing Mold
Crawling mold of the main tower of Huaibei Xiangwang Bridge (the main tower is inclined at a large angle of 30°)

02 Product Performance

High precision, reliable performance, good operability, good synchronization, good balance, easy turnover.

1. Climbing mold system in the climbing process power for their own hydraulic system, without the need for tower cranes or other lifting equipment.

2. Hydraulic automatic climbing mold system of high degree of mechanization, the whole construction process only need to carry out a formwork assembly, has been to the top of the floor, both save construction site, and reduce the formwork (especially the panel) of the bruise damage.

3. Strong adaptability, wide range of applications, not limited by height, can climb straight, can also climb diagonally, climbing safety, fast, smooth, good synchronization.

4. Provide a full range of operating platforms, so that the construction unit does not have to waste materials and labour in re-erecting the operating platforms.


  • (Taihong Yangtze River Bridge, Nanliang Expressway, Chongqing)
    (Taihong Yangtze River Bridge, Nanliang Expressway, Chongqing)
  • (Liuzigou Bridge of Liuwei Expressway)
    (Liuzigou Bridge of Liuwei Expressway)
  • (Chongqing Shaoxi River Bridge)
    (Chongqing Shaoxi River Bridge)
03 Production and lead time

Mature manufacturing process, can be customized and rented.

04 Service Force

Use of training:Professional on-site training delivery professionals.

Guided Installation:Professional guided installers.

During the daily use in site, the company organizes regular visits by relevant technical, sales and after-sales personnel.

Special technology utilization

Fulfillment of special requirements: for tower columns with an inclination angle of 30°

Data and examples

Huaibei Xiangwang Bridge of China Railway 10th Bureau
Yichang Miaotou Yangtze River Bridge, Gezhouba Five
Beijiang Third Bridge, Yingde City, China Road and Bridge Engineering Co., Ltd
Guizhou Road and Bridge Company No.2 Xikai Expressway Hot Spring Special Bridge
Guizhou Road and Bridge Company Zungui Expansion Xintianpo Special Bridge
Guizhou Road and Bridge Company Zungui Expansion Changtan River Special Bridge
Guizhou Road and Bridge Company No.5 Zungui Expansion Kakihuazhai Bridge
Guizhou Road and Bridge Company Chongqing Shaoxi River Bridge (Xishui Bank)
Hanjiang River Bridge of Menghua Railway, China Railway 11th Bureau
Lizigou Bridge of Guizhou Road and Bridge Company No.3 Du Xiang Highway (Liu Wei Section)
Guizhou Road and Bridge Company Chongqing Nanliang Highway Taihong Yangtze River Bridge (North Bank)
Guizhou Road and Bridge Company Meitan to Shiqian Expressway Wujiang Bridge (Shiqian side)
Tuntou River Bridge, Meitan to Shiqian Highway, Guizhou Road and Bridge Company

Hunan Wuxin Intelligence Technology Co., Ltd.
U beam formwork manufacturer T beam formwork supplier segmenatl beam formwork bridge formwork manufacturer form travellers supplier form travellers manufacturer girder formwork steel formwork